HV015H: Startup and Shutdown

Catalog
MIAT
Lec 46.00 Lab 14.00
Ext
0.00
Total
60.00
Qtr
4.00
TWC Qtr
5.00
The students will learn the procedures for the startup of hot water, steam heating, chilled water, and forced-air distribution systems after initial equipment installation or after an extended period of shutdown. Also included are the procedures for preparing these systems for extended shutdown.